  • Notification of Roadworks - Argyle Street, Picton

    Apr. 27 — Jun. 15, 2020 7:00am — 5:00pm

    Add this to Calendar

    Wollondilly Shire Council will commence work to relocate the existing pedestrian crossing from the intersection of Argyle St and Menangle St, Picton on Monday 27 April 2020. This project will be completed within 6 weeks. Worksite hours will be between 7am and 5pm. Stop/Slow traffic control will be in operation at worksite. Motorists and pedestrians may experience some minor delays. Emergency vehicles have... Read more…
  • Notification of Roadworks - Bargo River Road, Tahmoor

    May. 4 — Jun. 8, 2020 7:00am — 4:00pm

    Add this to Calendar

    Council will commence granular road reconstruction and sprayseal works along Bargo River Rd, Tahmoor (between Waratah Place & Noonamena Street) from Monday 4 May 2020, weather permitting. Works are expected to take 5 weeks. Worksite hours will be between 7am and 4pm. Stop/Slow traffic control will be in place. Motorists may experience delays. Emergency vehicles have priority of access throughout this period. Read more…
  • Notification of Roadworks - Remembrance Driveway, Bargo

    May. 20 — Jun. 1, 2020 7:00am — 5:00pm

    Add this to Calendar

    Council will be commencing roadworks on Remembrance Driveway, Bargo.between Yarran Rd to 3116 Remembrance Driveway from Wednesday 20 May 2020. Works are expected to take 8 working days (weather permitting). Worksite hours will be between 7am and 5pm. Traffic Control Operators will be working for the duration of scheduled work. Emergency vehicles have priority of access throughout this period. Map of roadworks at Bargo on... Read more…
  • Roundabout construction works

    May. 25 — 29, 2020

    Add this to Calendar

    Preliminary drainage work for the construction of a roundabout will be commencing on 11 May 2020 on Remembrance Driveway, Tahmoor (front of Tahmoor Inn). Works will be carried out from 11/05/20 to 15/05/20, and 25/05/20 to 29/05/20. This work will be carried out under traffic control & some delays may occur. Further information will be provided prior to commencing the actual roundabout... Read more…

    Additional Dates for this Event:

  • Notification of Roadwork along Burragorang Rd, Belimbla Park

    Thu, Jun. 4, 2020 7:00am — 5:00pm

    Add this to Calendar

    Wollondilly Shire Council will commence roadwork along Burragorang Road near Quarry Road. Works will commence on 4 June 2020 between 7am-5pm - weather permitting. The work is scheduled to be completed over 4 shifts. The work will include resurfacing and widening of a 660m long section of the existing roadway. Stop/Slow traffic control will be in operation during the work. Motorists may... Read more…
  • Notification of Roadwork- Avon Dam Rd, Bargo

    Thu, Jun. 11, 2020 7:00am — 5:00pm

    Add this to Calendar

    Roadwork will commence along Avon Dam Road near Reservoir Road from 11 June 2020, weather permitting. This work is scheduled to be completed over five shifts. Work will include resurfacing and widening of a 250m long section of the existing roadway. Avon Dam Rd Bargo Proposed Worksite Read more…
  • Notification of Roadwork on Avon Dam Road, Bargo

    Jun. 23 — 29, 2020 7:00am — 4:00pm

    Add this to Calendar

    *Update- Roadwork on Avon Dam Road * Council will be resume asphalt work on Avon Dam Road, near Reservoir Rd, Bargo on Monday 22 June. Shoulder work will commence on 29 June between 7am-4pm, weather permitting. Work will include reshaping the table drain and filling the drop-off to the edge of the new asphalt road work. Traffic Control... Read more…
  • Notification of Roadworks - Burragorang Rd, Belimbla Park

    Jun. 23 — Jul. 8, 2020 7:00am — 4:00pm

    Add this to Calendar

    Further, roadworks are scheduled to commence on Burragorang Rd, Belimbla Park from Tuesday 23 June, between house number 1107 Burragorang Rd to the intersection of Quarry Rd. Works are expected to be carried out over 10 working days (weather permitting). Worksite hours will be between 7am and 4pm. Please continue to drive carefully through work zones to meet the changed... Read more…
  • Temporary Road Closure - Douglas Park Drive

    Tue, Jun. 30, 2020 10:00am — 1:00pm

    Add this to Calendar

    Roadwork update - Douglas Park Dr, Menangle Removal of loose stone along Douglas Park Drive is scheduled for Tuesday 30 June between 10am-12pm, weather permitting. Due to site constraints, a temporary road closure is required to undertake the work. Read more…